Transit Miami Response to the Rickenbacker Causeway Improvements
Sorry for the delay in my response folks. As you may know, we here at Transit Miami were unable to attend the Cycling Town Hall Meeting co-hosted by Commissioners Ralph Cabrera and Carlos Gimenez several months ago. We received a lot of feedback from those who attended and we have reviewed the recommendations for improvement which were presented to the public.
We are pleased that new safety improvements are being considered, as they are long overdue. However, it seems that there is no coherent plan for how these improvements will be implemented. Indeed, details regarding the improvements remain absent.
What we do know is that the Rickenbacker Causeway is the premier recreation destination in the City of Miami, if not all of Miami-Dade County. Thus, we must think of the entire corridor as a big linear park. The area hosts many parks and attractions. They include:
- Miami Seaquarium
- Crandon Park/Tennis Center
- Bill Baggs Cape Florida State Park
- Mast Academy
- Alice Wainright Park
- Hobie Beach
In addition, the Miami Marine Stadium is slated to be renovated and Virginia Key will be converted into a major urban park, which will also include several miles of mountain bike trails. With a plethora of attractions/parks in such close proximity, it is imperative to provide safe connectivity for pedestrians and bicyclists.
With the diversity of users and the number of related destinations, a coherent Rickenbacker Causeway Master Plan should be developed in order to bring all the major stakeholders to the table, including the Village of Key Biscayne. This would be an immensely important undertaking, and the County Public Works Department should not be solely responsible for making these improvements without the input of the public and the Village of Key Biscayne and City of Miami.
Ideally, the Rickenbacker Causeway Master Plan would specify the details of the proposed improvements and analyze the proposed phasing already associated with the list of improvements slated for the Causeway.
Below is the summary of projects slated to be implemented over a 5-year period. The proposed projects listed below are all pedestrian/bicycle safety oriented improvements for the Causeway and would be funded through the use of the 25 cent allocation of every toll collected. Below each project you will find my commentary in bold.
Summary of Projects:
FY 10-11
Hobie Island Signalized Pedestrian/Cyclist Crossing and Turnaround $630,000
Description: Design and install a cyclist/pedestrian traffic light crossing at Hobie Island (Windsurfer Beach). The installation of a traffic light, striping, and signage will allow cyclists to turn from Eastbound to Westbound prior to reaching the toll plaza.
Does this require bicyclists to dismount? How is the traffic light activated? Where will it be placed? We need more details.
Rickenbacker Speed Limit Study $ 5,000
Description: PWD will conduct and evaluate results of speed study in order to determine whether the speed limits need to be modified and implement necessary signage changes.
Reducing the posted speed limit is very important, but it will have little to no effect on the actual speed of traffic without reconfiguring the roadway for slower speeds (signal timing, narrowing vehicular lanes, etc.)
Permanent “Vehicle Speed” Information Sign $ 80,000
Description: Install permanent ”Your Speed” information signs/speed radar light boards along causeway, to alert vehicles to their traveling speeds.
Not a priority (these are very expensive) if you design a roadway with a design speed not to exceed 40 mph. Money could be better spent elsewhere.
Improvements to Roadways Leading into Toll Plaza Phase 1 $ 160,000
Description: Modify lanes leading into the toll plaza on SE 26 Road/Rickenbacker Causeway from Brickell Avenue through the toll facility to Hobie Island, to accommodate and improve access to bicycle lanes.
The entire intersection before the toll needs to be redesigned. Crosswalks also need to be dramatically improved. Do we have drawings?
Total expenditures: $875,000
FY 11-12
Improvements to Roadways Leading into Toll Plaza Phase 2 $376,000
Description: Modify lanes leading into the toll plaza on SE 26 Road from Brickell Avenue to South Miami Avenue, and on South Miami Avenue from US 1 to S 25 Road, to accommodate bicycle lanes.
See comments from above.
Crandon Boulevard Lane Modification Phase 1 $507,750
Description: Re-design width, and restripe Crandon Boulevard vehicle travel lanes, from the east end of Bear Cut Bridge to the Village limits, inbound and outbound (north/south side), widen existing width of the dedicated bike path.
What is the width of the proposed bike lane? More importantly, what is the new width of the travel lanes and will there be a soft or striped barrier between the bike lane and travel lanes?
Total expenditures: $883,750
FY 12-13
Crandon Boulevard Lane Modification Phase 2 $492,250
Description: (Continued) Re-design width, and restripe Crandon Boulevard vehicle travel lanes, from the east end of Bear Cut Bridge to the Village limits, inbound and outbound (north/south side), widen existing width of the dedicated bike path.
See comments above.
Bicycle/Pedestrian Lane Mod West Bridge to Brickell Avenue $400,338
Description: Re-design, widen, stripe, and sign the existing ped-path/bike lane beginning at the north side (outbound travel) of the West Bridge bike underpass (along condominium wall/I-95 north/south flyover ramp) to Brickell Avenue.
How wide will the path be? What about those users who are never going to use the path, those heading to points south and west of Brickell?
Total expenditure: $892,588
FY 13-14
Bicycle/Pedestrian Lane Mod West Bridge to Brickell Avenue $99,662
Description: (Continued) Re-design, widen, stripe, and sign the existing ped-path/bike lane beginning at the north side (outbound travel) of the West Bridge bike underpass (along condominium wall/I-95 north/south flyover ramp) to Brickell Avenue.
See above.
Multi-Use Path along North Side of Rickenbacker Causeway on Virginia Key $450,000
Description: Provide multi-use trail along north side of causeway from Bear Cut Bridge to William Powell Bridge. Cyclists can use Mast Academy signal to cross causeway, then use aforementioned path to reach Sewer Beach Road.
We welcome an extension of the multiuse path. Although we would like to see drawings of the Mast Academy signal to cross the causeway.
Pedestrian/Bicycle Grade Separation across the Causeway $351,851
Description: Perform a study to evaluate the best location for a pedestrian/bicyclist grade separation from motor vehicles across the Causeway; Design and construct.
This is an expensive proposition that may be better spent getting roadway improvements for cyclists and pedestrians at grade, namely in signalization and improved crosswalks.
Total expenditure: $901,513
FY 14-15
Pedestrian/Bicycle Grade Separation across the Causeway $910,529
Description: (Continued) Perform a study to evaluate the best location for a pedestrian/bicyclist grade separation from motor vehicles across the Causeway; Design and construct.
See above.
Total expenditure: $910,529
We write this with great respect for the County Public Works Department, as this is a major project that is symbolic of a larger sea in recognizing the needs and rights of bicyclists and pedestrians. Unfortunately, there remain many missing details, including how we address safety on the bridges. Thus, we need a Rickenbacker Causeway Master Plan that looks comprehensively at the necessary improvements to furthering the success and safety of this recreational corridor. Going at it piecemeal is how we got into this mess in the first place. So, let’s not repeat the same mistake; let’s do it right for once and for all.
You can find more information about the proposed improvements here
Related posts:
- Reposted:Transit Miami Recommendations for the Rickenbacker Causeway
- Five Minutes on the Rickenbacker Causeway
- Time to stop playing politics on the Rickenbacker Causeway, every Sunday should be a ciclovia on the Rickenbacker.
- Why Bicyclists Keep Dying on the Rickenbacker Causeway
- My Thursday evening bike ride on the Rickenbacker Causeway
One Response to Transit Miami Response to the Rickenbacker Causeway Improvements
Leave a Reply Cancel reply
Categories
Accident Architecture bicycles bike lanes Bike Miami Days biking Biscayne Boulevard Brickell bus Climate Change Coconut Grove complete streets Downtown Miami FDOT High Speed Rail Metrorail Miami Miami-Dade County Miami-Dade Transit Miami 21 Miami Beach Museum Park News Parking Parks Pedestrian Pedestrians Pic o' the Day Planning Real Estate Development Rickenbacker Causeway Sprawl Streetcar Traffic Transit Transitography Transit Oriented Development Transportation Tri-Rail Uncategorized Urban Design Urban Development Boundary Urban Growth Urban Planning WalkabilitySouth Florida Transportation
- Bike SoMi
- Emerge Miami
- Florida Bicycle Association
- Florida Department of Transportation
- Florida Greenbook Roadway Design Manual
- Green Mobility Network
- Miami Bike Report
- Miami-Dade BPAC
- Miami-Dade Expressway Authority
- Miami-Dade Transit
- Slow Bike Miami
- Spokes 'n' Folks
- State of Florida Bike/Ped Laws
- TACOLCY Bicycle Club
- The M-Path to Enlightenment
- The Miami Bike Scene
- Transit to MIA
- Tri-Rail (South Florida Regional Transportation Authority)
Transit Blogs and Resources
- JACKSONVILLE TRANSIT
- Design New Haven
- City Transit Advocates
- Buildings and Food
- Human Transit
- Trains For America
- The Transport Politic
- Off the Kuff
- TheCityFix.com
- Spacing Wire • understanding the urban landscape
- trainjotting.com
- public transit
- The Overhead Wire
- Portland Transport
- Midwest High Speed Rail
- Greater Greater Washington
- Transit In Utah
- Welcome to the FastLane: The Official Blog of the U.S. Secretary
- Metro Library and Archive Transportation Headlines
- CoolTown Studios
- Streetsblog
- CitySkip
- CTA Tattler
South Florida Blogosphere
- 305 Misadventures
- Beached Miami
- BRICKELL LIFE
- Buildings and Food
- Coconut Grove Grapevine
- Coral Gables
- Coral Gables Watch
- Dolce Miami
- Eye On Miami
- greenerMIAMI
- Hallandale Beach Blog
- Herald Watch
- HOMESTEAD IS HOME
- JUSTICE BUILDING BLOG
- Liam Crotty Photography
- Miami beach 411
- Miami Every Day Photo
- Miami Fever
- Miami For Change
- Miami Urbanist
- Michael Emilio
- Photography is Not a Crime
- REV Miami – Music, Art, Events, and Counter-Culture Magazine
- Riptide 2.0
- South Beach Hoosier
- South Florida Bike Coalition
- South Florida Daily Blog
- Urban City Architecture
- Urban Environment League
- View from Virginia Key
- What Miami
Planning and Design Resources
- Transit Miami > Places > Miami > Rickenbacker Causeway > Transit Miami Response to the Rickenbacker Causeway Improvements
Archived Posts
Subscribe via Email
Recent Comments
- Diego Lucas on A Better Look at Miami’s Potential New Train Cars
- Mike Moskos on A Better Look at Miami’s Potential New Train Cars
- adam on A Better Look at Miami’s Potential New Train Cars
- Gables on A Better Look at Miami’s Potential New Train Cars
- Stephen on A Better Look at Miami’s Potential New Train Cars
- Mike Moskos on The road to immobility for older Miamians
Planetizen- Outlet Malls Buck Retail Trends May 24, 2013While traditional enclosed malls, big box stores, and strip malls are struggling in an uncertain retail marketplace, sales at America's outlet malls are growing at a healthy pace. One mall near New York City is showing the pains of popularity. […]
- Can Gentle Gentrification Create 'Shared Neighbourhoods'? May 23, 2013Is revitalization without displacement possible? Although it's a harder and longer process than unmitigated gentrification, Brent Toderian argues that "positive and responsible change" can coexist with the maintenance of existing communities. […]
- City Growth Picks Up, Continues to Outpace Suburbs May 23, 2013New census data shows that America's cities continue to grow at a faster rate than their suburbs, sustaining the reversal of a decades-long trend. […]
- Mapping the United States of Parking May 23, 2013With arresting infographics, architect Seth Goodman aims to expose the absurd parking requirements that can be found in cities across America. […]
- Chicago Plans Largest School Closing in Nation's History May 23, 2013Seeking to trim budgets and 'distribute scarce resources more efficiently,' Mayor Rahm Emanuel's controversial plan to shrink Chicago's school system moved ahead yesterday with the Board of Ed's vote to shut 49 of the city's elementary schools. […]
- Does Delhi's Drive to be a World-Class City Doom Low-Income Communities? May 23, 2013A proposal for a vertical neighborhood in Delhi is long on height but short on insight, according to Greg Randolph of the American India Foundation. Is Delhi ‘poised to repeat the public housing mistakes of the West’? […]
- Developing a Second Life for the Suburban Office Park May 23, 2013Across America, developers and municipalities are trying to adapt a relic of the sprawling post-war suburbs for a more urbane 21st century. Can office park makeovers revive these increasingly barren landscapes? […]
- Canada's Rental Housing Crisis: A National Disaster That Demands a National Answer May 23, 2013With little fanfare, a rental housing crisis has gripped Canada. 42 per cent of young adults live with their parents and hundreds of thousands are on affordable housing waiting lists. It's time for Ottawa to step in, argues Denise Balkissoon. […]
- Should Your City Ban Fluoride? Portland Just Did, Again May 23, 2013Although a growing list of communities (of which Portland is the largest) have banned the addition of fluoride to tap water, such places are doing so against the recommendations of the medical establishment. What's driving the backlash? […]
- A Modest Proposal for Pedestrian-Cyclist Detente May 23, 2013The impending launch of bike-share is sure to escalate the simmering tensions between New York's growing legion of cyclists and its hordes of pedestrians. L.V. Anderson and Aisha Harris propose a 10-point treaty for pedestrian-cyclist armistice. […]
- Outlet Malls Buck Retail Trends May 24, 2013
Green Mobility Network- An error has occurred, which probably means the feed is down. Try again later.









Its really good that they are doing something to help the bikers on the road. I brings lots of tourist to Key Biscayne and hopefully they won’t raise the toll too much more. I remember the days of 50 cents.