Transitography 18


Seattle metro tunnel, originally uploaded by Adam Holloway.

The newly renovated Seattle Transit tunnel will reopen to the public next Monday. After a $94 Million renovation and retrofitting, the final phase of the tunnel will be complete in 2009 when the Sound Transit LRT begins to fully utilize the tunnel instead of the current buses. Due to the reconstruction, a revolutionary precedent was set along Seattle’s downtown third avenue:

“Meanwhile, Third Avenue, which became a bus-and-bike street at peak hours during the two-year tunnel closure, will remain that way. More than 20 downtown surface routes will be shifted to Third Avenue, replacing 18 bus routes that will enter the tunnel.”

1 Response to “Transitography 18”


  1. 1 Anonymous

    Is something of that splendor even possible in Miami? It seems all infrastructure is so bland and concrete. I would love to see anything in the public realm look this nice in Miami

Leave a Reply